Temporary Pole 80
Ground Plumbing 80 Foundation 80 Framing 80 Plumbing, Electrical, HVAC top-out 150 Final Inspections 80 Pool (three inspections) 180 Accessory Buildings - per utility 80 All else - per utility 80 Plan Review Fee 75 Flatwork (if required) including concrete/asphalt 60 Reinspection (due to failed inspection - allow 1 failure before adding fee) Accessory buildings under 120 sq ft do not need a permit unless they contain utilities.
All accessory buildings must be at least 10 feet away |