Town of New Hope
INSPECTOR FEE SCHEDULE

Temporary Pole                                                                80
Ground Plumbing                                                            80
Foundation                                                                       80
Framing                                                                            80
Plumbing, Electrical, HVAC top-out                           150
Final Inspections 80
Pool (three inspections)                                                 180
Accessory Buildings - per utility                                     80
All else - per utility                                                           80
Plan Review Fee                                                               75
Flatwork (if required) including concrete/asphalt          60
Reinspection
(due to failed inspection -
allow 1 failure before adding fee)                                  

Accessory buildings under 120 sq ft do not need a permit
unless they contain utilities.

All accessory buildings must be at least 10 feet away
from property lines.